I thought I’d update a little on the upstairs.
We have framed in the boys closet so their room is finished except the loft bed to be built.
We have the walls up around the stairs and the bathroom framed. Mike was a little nervous putting the floor down in the bathroom making all his plumbing final! lol
All that’s left is the doorway into our bedroom, the walls around the a/c and the outside walls to our closet. Then we are onto the rafters, running wires, insulation and sheetrock. So like another day or two right?
No comments:
Post a Comment